Custom Architectural Lighting · Guzhen, China

Your Drawing.
Our Factory. Built to Fit.

Non-standard chandeliers and architectural fixtures, engineered to your site — not chosen from a catalogue.

One-off atrium pieces and batch project orders · Exporting for 10 years — Saudi Arabia, UAE, Germany, Italy, Russia, USA, UK, Australia · 1,000+ projects
Send Your Drawing View Projects
Projects delivered for
HILTON SHERATON CHINA RESOURCES HONG KONG CONVENTION CENTRE SAUDI ARABIA INDONESIA · RUSSIA · UAE · GERMANY · USA
30 mLargest chandelier built
2.2 tHeaviest single fixture
10 yrsExporting worldwide
5 yrWarranty on fixtures
Two Ways To Work With Us

One statement piece, or a full batch order

These are two different jobs with two different processes. Pick the one that matches your project — the terms below are not the same.

For a single feature piece

One-off statement chandelier

One fixture, engineered to your exact site dimensions and ceiling structure. Usually a hotel lobby, atrium or staircase void.

  • Quantity: 1 piece
  • Payment: 50% to start, 50% before shipment — built for one site only
  • No sampling stage — the signed engineering drawing is your approval
  • Approval point: structural, fabrication & installation drawings
  • On-site installation by our own team available
  • Lead time quoted per piece — atrium-scale work takes longer
For a project of many fixtures

Batch project lighting

Repeated fixtures across rooms, corridors and public areas. Hotels, shopping malls, residential developments.

  • MOQ: 1 piece — volume pricing at quantity
  • Payment: 50% to start, 50% before shipment
  • Sample first — fee credited back on bulk order
  • Approval point: written sample sign-off
  • Lead time: 40–60 days from drawing approval
Selected Projects

Hotel lobbies, banqueting halls, shopping malls

Every project below carries the client's real name. We don't publish anonymous "confidential projects" — ask us about any of these and we'll walk you through what we made.

Working on something in a different sector — mosque, villa, theatre, restaurant? Ask us. We've made fixtures for exhibition centres, sales galleries and clubhouses too.
Capability

What we can actually build

Design, laser cutting, welding, grinding, assembly, QC and packing run in-house, with long-term partner workshops in Guzhen for polishing and plating. One team stays accountable from your drawing to delivery.

SCALE

Whole-atrium scale

  • Largest built: 30 m diameter · 12 m high · 2.2 t
  • Modular production, sectional shipping, site assembly
  • Factory pre-assembly & full trial assembly before shipment
  • Rigging plans with structural calculation
MATERIAL

Crystal, metal, glass — to sample

  • Crystal K9 / Asfour, custom shapes from drawing
  • Brass, copper, stainless steel, aluminium, iron
  • Hand-blown & frosted glass, acrylic, fabric, resin
  • Gold, chrome, PVD, powder coat + custom colour matching
ELECTRICAL

Built for your market

  • Voltage: 110V / 220–240V, others on request
  • Dimming: 0–10V / DALI / TRIAC / DMX / wireless
  • Drivers: Meanwell, Osram — your spec welcome
  • Drivers & LEDs carry CE / RoHS component certificates
  • Whole-fixture certification arranged on request
  • Certification documents available on request
Why Us

Factory, not a trading desk

Most suppliers quoting your drawing are resellers. The difference shows up the moment your design isn't standard.

HINJU Lighting StudioTypical trading supplier
Your custom drawing Engineered in-house: structural drawings, 3D models, BOM, rigging plans with structural calculation Sourced from whichever workshop quotes lowest
Sample before bulk Material, finish, mini sample or full mock-up — trial assembly before bulk "Same as photo" — photo of a different project
Quality checks QC on welding, finish and assembly + 100% electrical test, with photos & video before shipment Visual check at pickup
Oversize fixtures Modular build, sectional shipping, every part numbered, 3% spare parts included Shipped whole, problems discovered on site
Who you talk to One dedicated technical contact from drawing to after-sales A salesperson relaying messages
After delivery On-site installation by our own teams — completed in Saudi Arabia, Indonesia and Russia Order closed at shipment
What Goes Wrong

Every one of these has happened on a real project

Nine problems that come up on almost every custom lighting job. The question isn't whether they happen — it's whether your supplier saw them coming before the container left.

What goes wrongHow we stop it
The fixture won't fit through the door, lift or stairwell Modular build designed around site access — assembled on site
The ceiling has no fixing points, or can't take the load Rigging plan with structural calculation; steel transfer frame where needed
Site dimensions don't match the architect's drawing Site measurement before drawings are finalised; drawing revisions answered in 2 days
The fixing height needs scaffolding or a crane Hoisting sequence worked out before production, not on site
One piece is too heavy or too big to ship Split into transportable sections, every part numbered to the assembly drawing
Crystal or finish doesn't match the approved sample Physical colour / finish sample signed off first; one production batch per project
Parts arrive missing, cracked or short 3% spare parts, crystals packed individually, fragile parts over-supplied
Voltage or dimming doesn't suit the destination 110V / 220–240V and 0–10V / DALI / TRIAC / DMX built to your specification
Certification isn't accepted in the destination country Component certificates supplied; whole-fixture testing arranged upfront with lead time quoted
These aren't hypothetical. They show up in production, in transit and on site — which is why our process is built around them rather than around a catalogue.
Quality Control

Nothing is built until you approve the technical standard

This is the process that catches the nine problems above — before they reach your site. Nothing goes into production until the drawing and the standard are signed off.

STAGE 1

Technical Standard Confirmation

  1. Site measurement — ceiling height, structure, fixing points
  2. Final specification locked
  3. Material & colour samples
  4. Structural, fabrication & installation drawings — with 3D model
  5. One-off pieces: drawing sign-off → production starts
  6. Batch orders: sample → trial assembly → written sign-off
STAGE 2

In-Factory Production Control

  1. Order review & drawing audit
  2. Laser cutting, welding, grinding in-house
  3. Polishing & surface treatment, QC at each step
  4. Factory pre-assembly & full trial assembly
  5. Semi-finished inspection
  6. 100% assembly & electrical test — every unit
STAGE 3

Delivery, Installation & After-Sales

  1. Export packing: crates, foam, numbered parts, 3% spares
  2. Photos & video of every finished fixture before shipment
  3. On-site installation — our teams have worked in Saudi Arabia, Indonesia and Russia
  4. 5-year warranty · replacement parts in 1 week
  5. Remote technical support & video-call guidance
Registered trademarks and 130+ patents. Certification, stated honestly: our drivers and light sources carry CE / RoHS component certificates; whole-fixture certification is arranged per project when your market requires it.
Working With Us

Terms for each type of order

Most suppliers make you send an email to learn the MOQ. Here are the terms upfront — and they differ depending on whether you need one piece or a batch.

One-off statement pieceBatch project order
Quantity 1 piece 1 pc minimum · volume pricing at quantity
Payment 50% to start, 50% before shipment — every fixture is made for your project, not for stock
Sample No sample stage — signed engineering drawings are the approval 15-day sample · fee credited against the bulk order
Lead time Quoted per piece — 60 days typical for atrium-scale work 40–60 days from drawing approval
Installation Our own teams install on site — completed in Saudi Arabia, Indonesia and Russia Supervision & commissioning on request, worldwide
After-sales 5-year warranty · 3% spare parts per project · replacements shipped within 1 week · remote video support

Certification — how it works

Drivers and light sources carry CE / RoHS component certificates. If your project needs whole-fixture certification, we submit the finished fixture for testing — extra lead time, quoted upfront.

Export packing

Wooden crates, moulded foam and numbered parts for oversize fixtures — crystals individually packed, fragile parts over-supplied.

Questions Buyers Actually Ask

Straight answers, no sales call needed

These are the ten questions that come up in almost every enquiry. If yours isn't here, ask it in the form below — you'll get an answer within 24 hours.

What is your minimum order quantity?

One piece. A custom chandelier is usually made one at a time for one specific site. For project orders there is also no minimum — volume pricing starts at quantity.

Can you work from a sketch, a photo, or just a concept?

Yes. From an architect's rendering, a reference photo, a hand drawing, site dimensions only, or a concept idea, we develop the 3D model, structural drawings, installation drawings and a bill of materials. You confirm the drawings before anything is produced.

How long does production take?

Batch orders: 40–60 days from drawing approval (50 days in peak season). Atrium-scale one-off pieces: around 60 days, confirmed in your quotation. Sample lead time is 15 days.

Do you install overseas?

Yes. Our own installation teams have worked on site in Saudi Arabia, Indonesia and Russia. Installation is quoted separately as travel + headcount + days, and remote video support is always included.

What are your payment terms?

50% to start, 50% before shipment. Every fixture is made for your project rather than for stock, which is why the deposit is 50% rather than the 30% a stock supplier can accept.

Is your lighting CE certified?

Drivers and light sources carry CE / RoHS component certificates. If your project requires whole-fixture certification, we submit the finished fixture for testing — tell us the destination country and we quote the extra lead time upfront.

How do you ship a chandelier several metres wide?

In sections, designed around the access route at your site. Every part is numbered to match the assembly drawing, crystals are packed individually, fragile parts are over-supplied, and 3% spare parts are included with each project.

What warranty do you give?

5 years on the fixture, excluding damage from misuse, natural events or installation by third parties. Replacement parts ship within one week, and we keep project spare-part records for future orders.

Can you match a specific finish or crystal type?

Yes. Physical finish and material samples are approved before production, and we accept colour matching against your own sample. Each project runs as a single production batch to avoid shade variation between units.

Do you work directly with interior designers?

Yes — with interior designers, lighting designers, FF&E procurement, hotel owners and contractors. Technical discussions can be held in English by video call, and drawing revisions are answered within 2 days.

Request For Quotation

Send us your drawing

Layout, reference photo or hand sketch — anything is enough to start. We'll reply with a feasibility answer and a budget range, not a catalogue.

✓ Feasibility answer within 24h ✓ Full quotation within 72h ✓ NDA on request

By sending this form you agree that we may contact you about your enquiry. Your details are not shared with third parties.

Drawing too large for a form? Architectural PDFs and DWGs are often 20–100 MB — send them straight to us:

✆